From: A Priori Implementation Effort Estimation for Hardware Design Based on Independent Path Analysis
Algorithm | Dev. time | Est. dev. time | Error |
---|---|---|---|
SS1 | 3.6 | 3.3 | 0.3 |
SS2 | 6.4 | 4.8 | 1.6 |
SS3 | 3.2 | 2.2 | 1 |
SS4 | 16.4 | 20.3 | −3.9 |
SS5 | 12 | 16.2 | −4.2 |
SS6 | 17.2 | 13.8 | 3.4 |
Ethernet app | 11.4 | 8.8 | 2.6 |
App 4 | 2 | 1.1 | 0.9 |
Mean (variance): | 0.2 (8) |